Full Home Interiors · Thane & Mumbai

Interior Design & Renovation
in Thane, Mumbai & Navi Mumbai

Star Art Works delivers modular kitchens, POP false ceilings, wardrobes, painting, plumbing & full flat renovations — 100% in-house crew, free site visit, clear quotation.

Modular Kitchens

Smart Modular Kitchens,
Crafted for Life

Acrylic, laminate & PU finishes with Blum soft-close hardware, quartz countertops, and moisture-resistant marine ply carcass.

Gypsum & POP False Ceilings

Designer Ceilings &
Ambient LED Lighting

Saint-Gobain Gypsum channels, concealed cove lighting, architectural downlights, and custom CNC lounge patterns.

Luxury Bedrooms

Custom Wardrobes &
Aesthetic Bedroom Walls

Sliding wardrobes, acoustic wall fluting, integrated bedside lighting, and space-maximizing storage solutions.

🏆

20+ Years

Craftsmanship Experience

🏡

500+ Homes

Renovated Across Mumbai

👷‍♂️

100% In-House

Zero Sub-contracting

Our Core Expertise

Modular Kitchen, False Ceiling & Full Interior Services

From POP gypsum false ceilings and modular kitchens to wardrobes, bathroom remodeling, painting, plumbing, and electrical — Star Art Works handles end-to-end interiors in Thane, Mumbai & Navi Mumbai under one roof.

Modular Kitchen Interior Most Popular

Modular Kitchens

Ergonomic, moisture-proof kitchen layouts built with marine plywood, acrylic laminates, quartz countertops, and soft-close baskets.

  • L-Shaped, Parallel & Island Layouts
  • Blum & Hafele Hardware Fittings
  • Anti-Scratch Acrylic Finish
False Ceiling POP Design In-House Master Craft

POP & False Ceilings

Flawless Gypsum false ceilings, decorative POP molding, concealed LED cove lighting, magnetic track lights, and acoustic insulation.

  • Saint-Gobain Certified Gypsum
  • Warm LED Cove & Spotlights
  • Seamless Cracks-Free Finishing
Living Room Interior Turnkey Renovation

Full Home Interiors

Complete turnkey home transformations including panelling, TV units, sofa back walls, flooring, painting, and lighting setup.

  • Custom TV Units & Louvers
  • Italian Marble & Vitrified Tiling
  • Royal Velvet / Asian Paints Finish
Custom Wardrobe & Furniture

Custom Wardrobes & Storage

Floor-to-ceiling sliding wardrobes, hinged glass doors, walk-in closets, study desks, and space-saving hydraulic beds.

  • Soft-Close Sliding Track System
  • Tinted Glass & Profile Frames
  • Termite-Proof Commercial Plywood
Bathroom remodeling by Star Art Works

Bathroom Remodeling & Civil

Complete bathroom dismantling, waterproofing, micro-grouting, large-format tile laying, and luxury sanitary installation (Grohe/Jaquar).

  • 100% Leakproof Polymer Coating
  • Concealed Diverters & Rain Showers
  • Floating Vanity Units
Electrical and AC installation with ceiling work

Electrical & AC Installation

Concealed copper wiring (Polycab/Finolex), MCB distribution boards, modular switches, and concealed copper AC piping with split-AC mounting.

  • Heavy-Duty Fire-Resistant Wires
  • Smart Automation Switchboards
  • Split-AC Mounting & Copper Piping
Plumbing and interior finishing

Plumbing Services

Pressure-tested CPVC supply lines, drainage and waterproofing coordination, fixture and tap installation, and geyser or RO points.

  • Pressure-Tested Leakproof CPVC Pipes
  • Fixture, Tap & Geyser Point Installation
  • Drainage & Waterproofing Coordination
Interior painting and bedroom finish Premium Wall Artistry

Interior & Exterior Painting

Texture painting, stencil artwork, PU wood polishing, anti-fungal exterior coats, and waterproof primer preparation.

  • Asian Paints & Berger Certified Colors
  • Luxury Velvet & Metallic Texture Wall Art
  • Waterproof Base Putty & Primer Application
Every Room, Covered

Spaces We Work In Across Thane & Mumbai Homes

Living Room
Guest Room
Kitchen
Wardrobe
Bedroom
Toilet & Bathroom
Balcony
Passage
Transparent Quoting

Every Quote Starts With a Free Site Visit

No online guesswork — we measure your flat, review material options, and share a fixed line-item quote.

01

Free Site Measurement

A senior engineer visits your home in Thane, Mumbai, or Navi Mumbai and maps dimensions, wiring, and plumbing.

02

Material Board Review

See real samples — gypsum, laminates, acrylics, hardware — so you know exactly what goes into your home.

03

Fixed Line-Item Quote

Receive a clear PDF with scope, brands, timeline, and total cost. No hidden charges mid-project.

Our Portfolio

Explore Our Recent Completed Projects

Real photos from recent site executions across Thane West, Powai, Bandra, Vashi, and Navi Mumbai.

Living Room Thane
Hiranandani Estate, Thane

Modern Minimalist 2BHK Lounge

Modular Kitchen Powai
Powai, Mumbai

Dual-Tone Acrylic Parallel Kitchen

Coffer False Ceiling Vashi
Vashi, Navi Mumbai

Coffer Ceiling & Warm Cove Light

Master Bedroom Suite Bandra
Bandra West, Mumbai

Luxury Suite with Fluted Wood Panel

Geometric Lattice Ceiling
Ghodbunder Road, Thane

Geometric POP Lattice Ceiling

TV Wall Unit Seawoods
Seawoods, Navi Mumbai

Marble & Louver TV Unit

Lounge False Ceiling
Majiwada, Thane

Warm Ambient Lounge False Ceiling

Panelled Bedroom
Kharghar, Navi Mumbai

Acoustic Panelled Master Bedroom

Multi-tier Ceiling
Worli, South Mumbai

Multi-Tier Architectural Cove Ceiling

How It Works

Your 4-Step Home Transformation Journey

We streamline the renovation process so you get on-time delivery with zero hidden surprises.

01

Free Consultation

Our expert site supervisor visits your space, measures dimensions, and understands your lifestyle & budget needs.

02

Clear Quotation

We share material samples and a fixed, line-by-line quotation — clear scope, brands, and total cost with no hidden charges.

03

In-House Execution

Our dedicated team of POP artists, plumbers, carpenters, and electricians execute work under strict site supervision.

04

Quality Check & Handover

After a thorough 50-point quality audit, we clean the premises and hand over your ready-to-live dream home.

Client Feedback

What Our Homeowners Say

Real stories from clients who trusted Star Art Works with their home transformation.

Got Questions?

Frequently Asked Questions

Clear answers to common renovation and contracting questions.

No! We employ a 100% in-house specialized crew for false ceilings, POP plastering, plumbing, electrical wiring, tiling, and carpentry. This ensures strict quality control and zero miscommunication on site.
A typical 2 BHK full home renovation takes approximately 35 to 45 working days, depending on structural civil modifications and custom woodwork scope.
We service all areas across Thane (West & East, Ghodbunder Road), Mumbai (Central, Western & South Mumbai), and Navi Mumbai (Vashi, Nerul, Kharghar, Seawoods).
After a free site visit and measurement, we issue a clear line-item quotation covering materials, labour, brands, and timeline. You approve the fixed quote before any site work begins — no surprise add-ons.
Both. Star Art Works handles POP & gypsum false ceilings, modular kitchens, wardrobes, painting, plumbing, electrical, bathroom remodeling, and complete 1BHK–3BHK renovations under one in-house team.
Interior Designer Near You

False Ceiling, Modular Kitchen & Home Interior Contractor in Thane & Mumbai

Searching for an interior designer or renovation contractor in Thane West, Ghodbunder Road, Powai, Bandra, Vashi, or Kharghar? Star Art Works is a local interior & civil contractor with a 100% in-house team for POP false ceilings, modular kitchens, wardrobes, bathroom remodeling, painting, plumbing, and electrical work.

We start with a free site measurement at your flat, share material options, and issue a fixed line-item quotation before any work begins — so homeowners across Thane, Mumbai, and Navi Mumbai can renovate with clear costs and on-time delivery.

Explore All Interior Services ➔
  • ✓ Free site visit & accurate measurement
  • ✓ Clear line-item quotation — no hidden charges
  • ✓ Saint-Gobain, Blum, Asian Paints & more
  • ✓ POP ceilings, kitchens, civil & electrical
  • ✓ Written timeline with 50-point handover
Get In Touch

Let's Plan Your Dream Space Today

Visit our office or call us directly to schedule a free site inspection & layout quote.

📍

Main Office & Workshop

Padwal nagar, near Thane MIDC, Wagle Industrial Estate, Thane, Maharashtra 400604

📞

Direct Call Contact

+91 77384 06563
+91 98676 75893

💬

WhatsApp Instant Chat

+91 83183 75165 ➔

🕐

Working Hours

Daily: 9:00 AM – 8:00 PM

Schedule a Free Site Visit

Fill out your details and our senior engineer will contact you within 2 hours.

Tapping this opens WhatsApp with your details pre-filled — just hit send.