
Flooring is the largest surface in your home and one of the hardest to change later. In a humid city like Mumbai, how a floor handles moisture, stains and daily wear matters as much as how it looks.
Vitrified tiles
Vitrified tiles absorb very little water, resist stains and wear well, which is why they are the most common choice for living areas, bedrooms and kitchens. They come in many finishes and large sizes, including designs that imitate marble or wood. Large tiles show fewer joints but need a very level base and a careful installer.
Ceramic tiles
Ceramic tiles usually cost less and are fine for walls and low-traffic areas, but they absorb more water and chip more easily than vitrified tiles. They suit bathroom walls and areas that do not take heavy use.
Marble and natural stone
Marble gives a look that tiles struggle to copy, and every slab is unique. It is also softer, can stain, and reacts to acidic spills. It needs polishing and sealing from time to time. Granite is harder and more stain-resistant and suits kitchens and entrance areas.
Wood and wood-look floors
Solid wood and laminate can swell and warp in high humidity, especially on ground floors or next to wet areas. Engineered wood handles moisture better, and wood-look vitrified tiles give the appearance with far less worry. Keep real wood away from bathrooms and balconies.
Installation checks that decide how long it lasts
- The base must be level and clean before laying begins.
- Use the right adhesive or mortar, and make sure the full back of the tile is covered. A hollow sound when tapped means a gap underneath.
- Keep joint widths consistent, with spacers.
- Large floors need expansion or movement joints in the right places.
- Wet areas need a slope towards the drain and anti-skid finish.
Before you order
- Order all tiles from the same batch so the shade matches.
- Add extra for cutting and breakage, and keep a few spare tiles for future repairs.
- Check the thickness and finish, and choose a matt or textured finish for balconies and bathrooms.
Tip: view the actual tile in your own room's light before you decide. Showroom lighting makes almost every tile look better than it does at home.

