Interior Painting: The Steps Behind a Smooth, Long-Lasting Finish

A good paint job is mostly preparation. Here is the sequence of putty, primer and coats that gives even walls, and how to choose between finishes.

Bedroom with panelled wall, cove ceiling lighting and custom storage

When paint peels, cracks or looks patchy, the paint itself is rarely the problem. The finish you see in the end is decided by the preparation underneath it. A reliable paint job follows the same sequence every time.

Check the wall first

Look for damp patches, fungus, hairline cracks and loose old paint. Damp walls should be dealt with at the source before any paint goes on, because paint over a damp wall will bubble and peel within weeks. Loose paint is scraped off and cracks are repaired.

Putty and sanding

Wall putty fills small dents and gives a smooth base. It is applied in thin coats and sanded once dry. Two thin coats usually look better than one thick coat. The sanding step is what gives walls that flat, even look in side light.

Primer

A coat of primer seals the putty, helps the paint grip and keeps the colour even. Walls facing the outside need a damp-proof or waterproof primer, and bathrooms and bedrooms in humid areas benefit from anti-fungal products.

Topcoats

Two coats of emulsion are standard. Let each coat dry fully before the next, and avoid painting on very humid or rainy days because the paint dries slowly and unevenly. Rollers give a more even finish on large walls, with brushes used for corners and edges.

Choosing a finish

  • Matt: hides small wall imperfections and suits bedrooms and ceilings.
  • Soft sheen or satin: easier to wipe clean, which suits passages, kids' rooms and kitchens.
  • Texture and metallic finishes: best on one feature wall rather than the whole room.
  • PU or enamel: for wood and metal surfaces such as doors and grills.

Get the order of work right

Paint comes after the dusty work: tiling, POP and false ceiling work, and drilling. Floors and fixtures should be covered, and the final coat is best done once carpentry is complete so the paint is not scratched or stained.

Colour tips

Test a small patch and look at it in daylight and in the evening with your own lights on. Colours look different on a full wall than on a small swatch, and light shades make small rooms feel larger.

Ask for the system, not just the colour: a good quote names the putty, primer and paint brand and the number of coats, so you can check the work against the quote.

Planning Work on Your Home?

Book a free site visit and get a clear, fixed quotation from our in-house team.

Book Free Site Visit ➔